Illustration Payment - Sabah

Schedule G – Generic Pictures
Description Works To Be Completed Illustration Pictures
2) On completion of foundation works of the Property.
  • Foundation works below lowest floor level:
    • Stumps
    • Piling & Pile caps
    • Raft foundation.
image
3) On completion of reinforced concrete framework of the Property.
  • All primary structural elements above lowest floor level including:
    • Beams
    • Columns
    • Suspended slabs
    • Roof Beams
image
4) On completion of brick walls of the Property with doors and window frames in position.
  • All brick wall within parcels
  • All party walls inclusive of wall stiffeners
  • Timber Door & Window Frames where there are no sub-frames
  • Floor slab soffits & ceiling framing
image
5) On completion of roofing and internal plastering of the Property.
  • Roof structure, roofing & flashing
  • All plastering to walls, soffits, slabs, beam
  • Wall tiles & other wall finishes
  • Floor screeding and/or other floor finishes
  • Painting to internal & external walls, floors and ceilings
image
6) On completion of electrical wiring and plumbing (without fittings) of the Property.
  • Electrical wiring
  • Water piping
  • Sanitary piping
  • Telephone trunking & cabling
image
7) On completion of the roads, drains and sewerage works serving the Property.
  • Paved Road leading to building containing the said parcel from an existing road.
  • Permanent roads around the building containing the said parcel
  • Entrance culvert serving the building Kerbs
  • Drains & Main Drains connected to outfall
  • Sewerage works including manholes from the building connected to a completed sewerage treatment system
image
Note: The photos are for illustration purposes and do not represent the actual construction site progress.
Schedule H – Generic Pictures
Description Works To Be Completed Illustration Pictures
2(a) The work below ground level including piling and foundation of the Building comprising the said Parcel
  • Foundation works below lowest floor level:
    • Stumps
    • Piling & Pile caps
    • Raft foundation.
image
2(b) The reinforced concrete framework and floor slab of the Parcel.
  • All primary structural elements above lowest floor level including:
    • Beams
    • Columns
    • Suspended slabs
    • Structural Walls
    • Roof Beams
image
2(c) The walls of the Parcel with door and window frames placed in position.
  • All non-structural wall within parcels
  • All party walls inclusive of wall stiffeners
  • Timber Door & Window Frames where there are no sub-frames
  • All frameworks for dry partitioning excluding lining of partition.
image
2(d) The roofing/ceiling, electrical wiring, plumbing (without fittings), gas piping (if any) and internal telecommunication trunking and cabling to the Parcel.
  • Roof structure, roofing & flashing
  • Floor slab soffits & ceiling framing of the said parcel
  • Electrical wiring within parcel
  • Water piping within parcel
  • Sanitary piping within parcel
  • Telephone trunking & cabling within parcel
img
2(e) The internal and external plastering of the Parcel.
  • All plastering to walls, soffits, slabs, beam, columns where specified
  • Wall tiles & other wall finishes
  • Linings, boards and panels to framed partitions
  • Floor screeding and/or other floor finishes
  • Painting to internal & external walls, floors and ceilings (if any)
image
2(f) The sewerage works serving the Building.
  • Sewerage works including manholes from the building containing the said parcel connected to a completed sewerage treatment system
image
2(g) The drains serving the Building.
  • Drains & Main Drains connected to outfall
img
2(h) The roads serving the Building.
  • Paved Road leading to building containing the said parcel from an existing road.
  • Permanent roads around the building containing the said parcel
  • Entrance culvert serving the building
  • Kerbs
image
Note: The photos are for illustration purposes and do not represent the actual construction site progress.