Description Works To Be Completed Illustration Pictures
2(a) Foundation Works Foundation works below lowest floor level:
  • Pile cap
  • Piling
2(b) Ground floor slab, ground floor columns. Primary structural elements Ground floor level including:
  • Ground beam
  • Ground floor slab
  • Ground floor columns
2(c) First floor slab, roof beam and walls in position
Wall Position
Upper roofing
  • 1st floor Internal brick wall & party wall in position
  • 1st floor setting; of door or window sub-frames or opening
  • 1st floor roof beam
2(d) Roofing
  • Top roof system installed.
  • Top roof truss and roof tiles installed
2(e) Internal plastering, electrical conduits (without wiring) and plumbing (without fittings).
  • M & E piping, sleeves in place
  • Plastering to walls and other surface
2(f) External plastering
  • Plastering external walls
2(g) Ceiling, doors and window including glazing, soil drainage, septic tank and lower roofing
  • Door, window in place
  • Sanitary wares & fittings
  • Ceiling installed
  • Lower roofing completed
  • Soil drainage and septic tank completed
2(h) Driveway, apron, perimeter drain, fencing and gate
  • Concrete to driveway, perimeter drain, apron
  • Fencing and gate in place
2(i) Painting and physical completion of the said building
  • House painted and compound or yard are clear of debris
Note: The photos are for illustration purposes and do not represent the actual construction site progress.
Form C – Generic Pictures
Description Works To Be Completed Illustration Pictures
2(a) Foundation Works Foundation works below lowest floor level:
  • Piling & Pilecaps
  • Foundation slab
2(b) The reinforced concrete framework, and floor slab of the Parcel All primary structural elements above lowest floor level including:
  • Beams
  • Columns
  • Suspended slabs
  • Structural Walls
2(c) The walls of the said Parcel with door and window frames placed in position
  • Non-structural wall within parcels
  • Party wall
  • Timber Door & Window Frames
2(d) The roofing/ceiling, electrical conduit (without wiring), plumbing (without fittings), gas pipings (if any) and internal telephone trunking and cabling (if any) to the said Parcel.
  • Floor slab or slab ceiling of the said parcel
  • M & E piping, sleeves in place
2(e) Internal Plastering of the said Parcel.
  • Plastering to walls
  • Floor screed and/or other floor finishes
2(f) External plastering of the said building.
  • Plastering of the building exterior walls and other surface.
2(g) Painting of the said Building.
  • Painting of the external walls and other surface.